
Westports CT10–CT13 Reclamation
PVD installation for the dredging and land reclamation works of new container terminals CT10 to CT13 (Phase 1).
From KLIA2, ECRL and the Penang Second Bridge to power stations, ports and reclaimed coastline: the ground we have made ready to build on, across Malaysia and abroad.
Each dot is a location from our site records (210 locations, Malaysia and the region). Tap a dot for the type of work; use the legend to filter.
A selection from our project records, ongoing and completed: airports, bridges, power stations, ports, highways and rail.

PVD installation for the dredging and land reclamation works of new container terminals CT10 to CT13 (Phase 1).

PVD and ground works on Sections 1, 4, 5, 6, 8 and 9, including the Kuantan Port City station subgrade.

Geotubes, geotextile, silt curtains and geobags for the 500-acre development next to Kuantan Port, including a section for the Royal Malaysian Navy.
Read case study →
PVD installed from barges, geotubes and geotextile for the temporary coastal protection, and PVD for the perimeter protection and reclamation of Phases 2B and 2C.
Read case study →
PVD and geotextile works on the Batu Kawan approach of the Sultan Abdul Halim Muadzam Shah Bridge.
Read case study →
PVD and geotextile works across the KLIA2 development, LCCT runway, airside and perimeter road packages.
Read case study →
Geotubes, sand-filled mattresses and geotextile for the coastal coal-fired power station.
Read case study →
PVD installation for Tanjung Bin power station works.

PVD installation across port expansion packages.
Read case study →
PVD installation for the NBCT container terminal.

PVD and geotextile works on multiple sections, from Teluk Intan in 2015 to Selangor Phase 1 Section 3 in 2025.
Read case study →
PVD, woven and non-woven geotextile works across Sections 1B, 2 and 3.

PVD and geotextile works for the expressway into Johor Bahru city centre.

Geotextile and gabion works for the Sungai Buloh–Kajang MRT depot.

Geogrid works on the Rawang–Ipoh electrified double-track railway.

PVD and geotextile works within EPCC reclamation, soil-improvement and shore protection scopes.
Read case study →
Prefabricated vertical drain installation for land reclamation at Melaka Gateway.
Read case study →
Geotextile, PVD and geotube works for Country Garden Pacificview and Mah Sing reclamation.

Geotextile and PVD works for the Malaysian Institute of Aviation Technology campus.

PVD installation in Medan (Phase 2, for Waskita Karya) and at Pangkalan Susu.

Geotube shoreline protection for the eroding mangrove coast at the southern tip of mainland Asia.
Read case study →
Geobag and geotube coastal protection to stop beach erosion at the Bank Negara Malaysia resort.

Geotube revetment to restore and protect the Bank Negara Malaysia resort beachfront, plus further geotube works around Langkawi.

Geotube installation to protect and re-establish mangrove forest along the coast.

Geotube installation for coastal works in Bintulu.
PVD installation for the runway extension at Limbang Airport.
PVD and horizontal drain supply and installation for the earthworks, soil treatment and access road of the new airport.
PVD and horizontal drain works on Sections 2 and 3 of the Limbang work package, under the Northern Region Development Agency.
PVD and horizontal drain works on Packages 1 and 2 of the new dual carriageway.
PVD supply and installation for the Malaysia Phoenix biorefinery, producing Sustainable Aviation Fuel.
Read case study →PVD installation for Work Package 24, Sungai Takala to Kampung Perpaduan.
Geotextile works for the bridge across Sungai Pulai and the link road from Tanjung Pelepas to Tanjung Bin.
PVD installation on Sarawak Coastal Road packages.
PVD installation for the coastal expressway, Phases 1 and 2 including Section B.
Earthworks, ground improvement and geocell works for the Serdang Depot, Package DPT203.
PVD installation and geogrid haulage road works at the Refinery and Petrochemical Integrated Development.
Read case study →PVD installation for Forest City reclamation, including the Phase 1 golf course reclamation.
PVD and geotextile works across several phases of Batu Kawan development, including BKIP3.
PVD installation for industrial port-side platforms.
PVD installation at the Gebeng industrial zone.
PVD installation for airport works in Sabah.
Ground improvement works upgrading the access road from KCT to Northport.
PVD installation for the Shilin Technology Park development.
Geotextile works at Changi Airport, and PVD for Terminal 5.
PVD installation for a power plant project.
Geotube installation for coastal erosion control, for the Department of Irrigation and Drainage (JPS).
Geotube installation for coastal protection.







Talk to the group that supplies the material, brings the machinery and installs it, all under one contract.