T: 1700-81-9753 info@ajtgeo.com
AJT GeosyntheticsGround Engineering · Since 1994
Case study · Reclamation

Melaka Gateway

Client

Sinohydro Corporation (M)

Location

Melaka

Period

2017–2018

Scope

PVD installation

The project

The challenge

Melaka Gateway is a land reclamation development off the coast of Melaka, creating new islands for mixed development.

Reclaimed sand sits on soft seabed clay that consolidates slowly. Vertical drains are installed through the fill so the clay settles during construction rather than afterwards.

Our role

What we delivered

For Sinohydro Corporation we installed prefabricated vertical drains across the reclaimed platform, panel by panel, with daily installation reports and per-panel summaries for the client.

  • PVD installation through reclamation fill
  • Daily installation records and per-panel summaries
  • Our own rigs and site supervision
On site

Project photos

Services used

Prefabricated Vertical Drains

Have a similar project?

Talk to the team that delivered Melaka Gateway. We'll come back with a method, a programme and a price.

Request a Quote