Case study · Reclamation
Melaka Gateway
Client
Sinohydro Corporation (M)
Location
Melaka
Period
2017–2018
Scope
PVD installation
The project
The challenge
Melaka Gateway is a land reclamation development off the coast of Melaka, creating new islands for mixed development.
Reclaimed sand sits on soft seabed clay that consolidates slowly. Vertical drains are installed through the fill so the clay settles during construction rather than afterwards.
Our role
What we delivered
For Sinohydro Corporation we installed prefabricated vertical drains across the reclaimed platform, panel by panel, with daily installation reports and per-panel summaries for the client.
- PVD installation through reclamation fill
- Daily installation records and per-panel summaries
- Our own rigs and site supervision
Have a similar project?
Talk to the team that delivered Melaka Gateway. We'll come back with a method, a programme and a price.