Case study · Highway
West Coast Expressway
Client
Gabungan Cekapbina · WCT · Mitrajaya · Ganda Imbuhan · IJM
Location
Selangor & Perak
Period
2015–2025
Scope
PVD & geotextile, multiple sections
The project
The challenge
The West Coast Expressway is a tolled highway along the west coast of Peninsular Malaysia, from Banting in Selangor to Taiping in Perak.
Much of its alignment crosses coastal plains, oil palm estates and former swamp, where soft clay lies close to the surface. Embankments built on that ground need treatment so they don't keep settling after the road opens.
Our role
What we delivered
Since 2015 we have worked on several sections of the WCE, each under its own main contractor:
- Teluk Intan: PVD and geotextile (2015)
- Section 3: PVD, for WCT (2016)
- Section 1: PVD and geotextile, for Gabungan Cekapbina (2017)
- Section 2: PVD, for Mitrajaya (2017)
- Section 6: PVD, for Ganda Imbuhan (2019–2021)
- Section 8 (Perak): PVD, for IJM
- Selangor alignment Phase 1, Section 3: for IJM (2025)
Have a similar project?
Talk to the team that delivered West Coast Expressway. We'll come back with a method, a programme and a price.


