Case study · Bridge

Penang Second Bridge

Client

IJM Construction

Location

Batu Kawan, Penang

Period

2012–2013

Scope

PVD & geotextile, Package 3B

The project

The challenge

The Sultan Abdul Halim Muadzam Shah Bridge, better known as the Penang Second Bridge, links Batu Maung on Penang Island with Batu Kawan on the mainland. It opened in 2014 as the longest bridge in Southeast Asia.

On the Batu Kawan side, the approach roads and interchange ramps run across soft coastal ground. That ground had to be consolidated before the embankments could carry traffic without excessive settlement.

Our role

What we delivered

Working for IJM Construction on Package 3B, we installed prefabricated vertical drains and geotextile beneath the approach embankments and interchange ramps, including ramps 1 to 8, plus variation works on the adjoining package.

  • PVD installation under ramp and approach embankments
  • Geotextile separation and reinforcement layers
  • Variation works delivered on the same mobilisation
On site

Project photos

Services used

Prefabricated Vertical DrainsGeotextiles

Have a similar project?

Talk to the team that delivered Penang Second Bridge. We'll come back with a method, a programme and a price.

Request a Quote