Prefabricated Vertical Drain (PVD) Installation in Malaysia

PVD supply and installation with our own rigs and crews, on land and from barges, for highways, runways, reclamation and industrial platforms on soft clay.

Soft soil consolidation

Build on soft clay in months, not years

With 38 rigs and installation depths of up to 38 m, we can take on the largest soft-ground programmes in Malaysia. Much of Malaysia's coastal and low-lying land sits on thick deposits of soft marine clay. Left alone, it can keep settling for decades after an embankment is built on it.

Prefabricated vertical drains (PVDs, also called wick drains or band drains) solve this. They are thin, flexible drains with a plastic core wrapped in a geotextile filter, installed vertically into the clay at close spacing. Each drain gives pore water a short path to escape. With a surcharge or preload on top, the clay consolidates within the construction programme, rather than under your finished road or runway.

Our group has installed PVDs on highway, airport, rail, port, reclamation and energy projects in Malaysia and abroad for more than two decades, with its own rigs and crews.

Get a Quote
Installed prefabricated vertical drains with horizontal drains connecting to the drainage blanket
How we install

From working platform to settlement monitoring

  1. Working platform & drainage blanket. A sand blanket is placed over the soft ground to carry the rigs and collect water from the drains.
  2. Setting out. Drain positions are marked to the design grid and spacing on the approved shop drawing.
  3. Installation. A steel mandrel with the drain inside is pushed into the clay to the design depth, then withdrawn, leaving the drain anchored in place.
  4. Recording. Every drain is logged with its position and penetration depth, giving you a complete installation record.
  5. Surcharge & monitoring. Fill or preload is placed and settlement is monitored until the design consolidation is reached.
Row of PVD installation rigs on a reclamation site
Applications

Where it's used

  • Highway and expressway embankments
  • Airport runways, taxiways and aprons
  • Land reclamation and port platforms
  • Industrial, refinery and plant platforms
  • Rail depots and approach embankments
  • Housing and township earthworks on soft ground
Why AJT

Supply and installation, one team

  • 38 rigs of our own, maintained in-house by Gateway Machinery
  • Installation depths of up to 38 m
  • Drain material supplied and installed under one contract
  • Method statement, shop drawings and installation records by one team
  • Experience from KLIA2, WCE, MRT Line 2, RAPID and Limbang Airport
  • Work across Peninsular Malaysia, Sabah, Sarawak and abroad, including PVD from barges
Track record

PVD projects

Port

Westports CT10–CT13

Port Klang · 2025–2026

PVD for the dredging and land reclamation of new container terminals.

Rail

East Coast Rail Link

Pahang, Terengganu, Kelantan · 2018–2025

PVD and ground works on multiple ECRL sections.

Reclamation

Seri Tanjung Pinang 2

Tanjung Tokong, Penang · 2021–2024

PVD installed from barges, and PVD for the Phase 2B and 2C reclamation.

Read case study →
Aviation

Limbang & Lawas Airports

Sarawak · 2025–2026

PVD for the Limbang runway extension and the new Lawas Airport.

Highway

West Coast Expressway

Selangor / Perak · 2015–2025

PVD and geotextile works on multiple sections.

Read case study →
Aviation

KLIA2 & LCCT

Sepang, Selangor · 2009–2013

PVD and geotextile works across several packages.

Read case study →

See all projects

FAQ

PVD questions

What is a prefabricated vertical drain (PVD)?

A PVD is a band-shaped drain, usually around 100 mm wide, made of a grooved plastic core wrapped in a geotextile filter. Installed vertically into soft clay, it shortens the distance pore water must travel, so the soil consolidates much faster under load.

Is a PVD the same as a wick drain or band drain?

Yes. Prefabricated vertical drain, wick drain and band drain are different names for the same ground improvement product.

How long does consolidation take with PVDs?

It depends on the clay properties, drain spacing, drain length and surcharge height, and is set by the geotechnical designer. Typically, consolidation that would take many years naturally is achieved within months.

What spacing and depth are PVDs installed at?

Spacing and depth come from the project design. Drains are commonly installed on a square or triangular grid at roughly 1 to 2 metre spacing, to the bottom of the soft clay layer. We install to the approved design and record the depth of every drain.

Do you supply the PVD material as well as install it?

Yes. We can supply drain material to the project specification and install it with our own rigs and crews, or install client-supplied material.

Which areas of Malaysia do you cover?

We work throughout Peninsular Malaysia and East Malaysia, including Selangor, Johor, Melaka, Perak, Kuala Lumpur and Sarawak.

Planning PVD works?

Send us your drawings, soil investigation or BQ. We'll reply with a method, a programme and a price.

Request a Quote