Scope
Marine PVD from barges, geotube, geotextile
The project
The challenge
Seri Tanjung Pinang Phase 2 (STP2) is a land reclamation project off Tanjung Tokong, on the north-east coast of Penang Island.
Before reclamation fill can be placed, the work area must be protected from waves and the soft seabed treated so that the new land consolidates during construction.
Our role
What we delivered
We worked on Phases 2B and 2C in two stages:
- For Kerjaya Prospek (2021–2022): temporary coastal protection for Phase 2B and part of Phase 2C, with PVD installed over water from barges, geotubes, geotextile and sand, plus geotextile for the rock bund during dredging
- For China Communications Construction (2023–2024): PVD for the perimeter coastal protection and the dredging and reclamation works of Phases 2B and 2C
Installing PVD from barges let the drains go in over open water, ahead of the reclamation fill.